What Is Interval Electricity Data?

Updated

Interval electricity data is metered electricity recorded on a repeating time step, such as every 15 minutes or every hour, rather than one total for a billing month. Each row is the energy in that step or the average power across it. A monthly bill can show purchased energy and, on many commercial accounts, one demand figure. The file shows when that use occurred, not which equipment caused it or what happened inside the step.

Decision flow separating a repeating interval record from a monthly total and from a demand window that may not match the step.

A repeating interval shows when electricity was used, while a monthly total hides that shape, and billed demand follows the tariff window rather than every short row or the equipment behind the meter.

A monthly total hides the shape of use

A facility bill states charged energy, usually in kilowatt-hours, and it may state one demand figure. Those results do not show whether the high point lasted one step or all afternoon, which weekday it fell on, or whether it lined up with hours a solar array would be producing.

Interval electricity data is the sequence behind that result. The U.S. Energy Information Administration’s Form EIA-861 instructions, read November 22, 2026, with an Office of Management and Budget expiration of July 31, 2029, define advanced metering infrastructure as meters that record usage at least hourly and provide that data at least daily to energy companies, and that may also provide it to consumers. That survey category is not a commercial demand window, and it does not mean every Maryland, Virginia, or District of Columbia account has an hourly export.

The Department of Energy’s Green Button page, read November 22, 2026, says the format can carry 15-minute, hourly, daily, or monthly intervals, depending on the utility. It dates the launch to January 2012 and does not name a current interval for a specific utility.

What one row actually measures

An interval value is an amount over a window, not an instant. An energy column is what passed the meter during the step. A power column is commonly average power: energy divided by the step length in hours. A 15-minute file has 96 steps in a 24-hour day that a clock change does not shorten or lengthen. An hourly file has 24. Those counts are arithmetic, not a description of a particular meter.

The average hides a spike that rises and falls inside the step. A motor start or a brief overlap of two processes can sit inside one row. The Green Button Alliance says the format can carry an interval as short as one second, that most jurisdictions require one-hour intervals at a maximum for residential electricity, and that some may require 15-minute or 5-minute intervals for commercial or industrial customers. That is the Alliance’s summary, not a Maryland, Virginia, or District of Columbia statute. Use the step in the file and the step named in the tariff.

Some files stamp the start of the step and some the end, so 1:00 p.m. may be the hour that ended then or the hour that began. As of November 2026, Dominion Energy Virginia’s Detailed Energy Use page says a download usually covers a day, but meter transmission time or daylight-saving time can make it more or less than a day’s usage. Matching an on-peak clock, or a solar file from another system, requires that time basis.

Watt-hours are not kilowatt-hours, and a multiplier may or may not already be applied. Delivered, received, and net energy are different channels, as are kilowatts, kilovolt-amperes, and reactive power. The Alliance describes a quality-of-reading tag that can mark a value raw, later valid for billing, or estimated. A missing tag does not prove every row is an actual read. Utilities do not typically gather usage on the building side of the meter, so the service-point file cannot name the chiller, the chargers, or the kitchen.

Demand and energy do not share one window

Energy is additive. If every step is actual kilowatt-hours on the same channel and multiplier, the sum is the period energy, aside from rounding and from steps the utility estimated or edited. Folding four 15-minute values into an hour keeps that hour’s energy and drops the differences among the four steps.

Demand is a rate, not that sum. Tariffs usually take the maximum average power over a stated window, sometimes only in named hours, and sometimes with a minimum carried from an earlier month. An hourly file cannot reconstruct a 15-minute or 30-minute billed demand, because the hour blends the peak with quieter steps. The highest 15-minute average is not the billed demand when the tariff uses 30 minutes, an on-peak window, or a carried minimum. Combine the short rows into the tariff window first. The demand register may also be a separate calculation from the energy export.

Wholesale products use their own interval. PJM Manual 11, Revision 137, effective July 28, 2026, requires demand-resource interval meters at the distribution-company account, sufficient for hourly, one-minute, or real-time data as that product requires. Section 10.6 says retail interval metering and load data are deemed to meet PJM’s requirements for energy settlement and capacity compliance. A retail file can still differ from a settlement file in interval and in validation. This page does not describe enrollment.

A clean series still shows weekday highs versus one-off spikes, the nighttime base, and whether high import falls during hours an array would usually produce. That comparison is timing, not measured production. A short spike and a multi-hour plateau are different problems. Soleil’s guide to demand charges, solar, and batteries explains how a bill line can follow the peak. Hourly data can show daylight overlap and cannot reproduce demand defined on a shorter step.

What the same file cannot show

The file is not gross building load if the meter nets generation. In Pepco’s Maryland tariff book, whose cover records a distribution update effective November 1, 2026, the net energy metering rider uses a watt-hour meter with reverse registration to measure net watt-hours consumed or delivered for the billing period. On listed time-metered schedules, the rider applies on the basis of each time-metered pricing rather than total monthly energy. That is not gross load. As of November 2026, Dominion’s Detailed Energy Use page says daily usage for a net-metering participant is delivered usage. Confirm whether each row is delivered, received, or net.

The series omits equipment not yet installed, chargers absent from the history, power quality unless those channels were recorded, and battery losses, recharge import, and energy held back for an outage. A zero can be a shutdown, an outage, a failed communication, or an estimate. Dominion states, as of November 2026, that a communication gap may appear as zeros in the 30-minute table, while the daily chart may fold the missing energy into a later aggregate.

Battery meters are a different instrument. The Federal Energy Management Program’s battery evaluation method, published January 30, 2024, looks at charge and discharge on the storage system. One meter reporting only the net of a step can hide movement inside it: equal energy in and out within an hour can read as zero. A zero hour may mean the battery was idle, not unavailable. A utility import file does not measure that throughput, and it is not a design for a battery that is not installed.

Confirm the file before it is used for solar or storage

No historical series on this page sizes a system. A qualified professional has to tie the rows to the account, the tariff, the meter boundary, and how the site will operate.

Check What to confirm
Identity Account, service address, and meter match the building. Separate meters are separate series.
Step length The file states its step, and that step is the one the study claims to use.
Time basis Time zone, start versus end stamp, and daylight-saving storage.
Quantity Energy or average power; watt-hours or kilowatt-hours; whether a multiplier is already applied.
Direction Delivered, received, net, or a demand register. Kilovolt-amperes are a separate column if present.
Quality Actual, estimated, or edited, and what was done with gaps.
Span History covering the seasons and operations the project must live with, plus any abnormal closure.
Tariff Schedule name, demand interval, rating periods, and any minimum carried from an earlier month.
Generation Whether on-site generation is inside this meter, on a production meter, or both.
Authority The customer has allowed the holders of the file to use it.

NIST Special Publication 800-82, Revision 3, published September 28, 2023, is a security guide for operational technology, including measurement systems. It does not set a billing interval. Follow the utility’s consent path before a third party holds the series. A production meter is a third boundary, separate from utility import and from battery charge and discharge. Soleil Energy’s monitoring and operations work covers systems already installed. It does not convert a utility download into production the site never metered.

An illustrative conversion, not a sizing result

This arithmetic is illustrative. It is not a customer’s load, a Soleil Energy project, or a proposed battery.

A 15-minute row of 12 kWh delivered is an average of 48 kilowatts for that quarter hour, because 12 divided by 0.25 hours is 48. A two-minute spike inside the step is invisible. If the next row is 6 kWh and those two rows form the tariff’s 30-minute window, that window is 18 kWh over half an hour, or 36 kilowatts. The higher quarter-hour average remains 48 kilowatts. Calling 48 kilowatts the billed demand would overstate that half hour. An hourly total would understate it if the rest of the hour were quiet. None of these figures is a power rating, a duration, or installed energy.

Show the tariff window beside the plotted peak, and say which rows were estimated. The guide to commercial battery storage in Maryland frames a storage project in that state. It is not a substitute for these checks.

What three local tariffs measure, as of November 2026

The leaves below are the documents read for this section, not every account in the region. District of Columbia tariffs were not used. Confirm the schedule on the bill.

As of November 2026, Pepco’s Maryland electric tariff, whose cover records a distribution and revenue-deferral update effective November 1, 2026, includes Schedule MGT LV II. The availability leaf issued November 4, 2026, effective for usage on and after November 1, 2026, describes maximum 30-minute demand of at least 25 kilowatts and below 1,000 kilowatts in one or more of twelve billing months, or stated energy thresholds. The same band appears on other medium schedules, so the bill name controls. The billing-demand leaf issued August 14, 2026, effective for usage on and after August 11, 2026, sets billing demand as the maximum 30-minute demand recorded in the billing month. Schedule GS is for accounts that have not crossed those tests. An optional-metering leaf issued June 28, 2019, still in the book, says advanced metering can record 15-minute consumption for specified schedules, including MGT LV II. That leaf is not a 15-minute customer-portal export.

As of November 2026, BGE Schedule GL applies where monthly demand is 60 kilowatts or more, at secondary voltage or at primary voltage when Schedule P does not apply. Billing demand is the maximum 30-minute measured demand, to the nearest whole kilowatt, in each rating period. Generation and transmission demand use the peak period. Delivery demand uses any rating period. Peak hours differ by season, and non-summer periods begin and end one hour later in defined weeks around the daylight-saving change. The demand wording sits on a leaf filed January 12, 2024, inside a file that also contains a leaf filed April 30, 2026. Confirm the account is on Schedule GL.

As of November 2026, Dominion Energy Virginia Schedule GS-2, filed December 9, 2025, and effective for usage on and after January 1, 2026, sets demand as the highest average load in any 30-minute interval of the billing month. The minimum is the highest of several tests. When demand has reached or exceeded 500 kilowatts in the current or preceding eleven billing months, one test is not less than the highest demand in that span. Power factor below 85 percent can set another minimum from kilovolt-amperes. A 30-minute energy file can help reconstruct the highest average and does not apply those minimums by itself. Detailed Energy Use says communicating smart-meter customers can download 30-minute usage, updated once a day, and that the bill is not calculated from that table.

Questions to settle before a proposal

Is the highest row the billed demand?

Only if the tariff says so. The billed figure may be a longer average, an on-peak window, whole-kilowatt rounding, or a minimum from an earlier month. As of November 2026, BGE Schedule GL bills delivery demand and generation and transmission demand from different rating periods. Name the bill line before comparing a plot with it.

Can one peak month size storage?

No. One month misses other seasons and equipment that is about to change. A battery that is not yet installed also needs a written list of what the model assumes will change. The file does not contain that list.

If solar is already installed, is the interval the building load?

Only if the channel is gross load. Pepco’s Maryland rider, in the book read for November 2026, measures net watt-hours for the billing period or, on listed time-metered schedules, each time-metered pricing. Dominion’s daily figure for a net-metering participant is delivered usage. Gross load needs the received channel, a production meter, or a documented combination.

Why can a 30-minute portal and the bill disagree?

The portal can be unvalidated, can show gaps as zeros, and can omit ratchets, power factor, and rating periods. Dominion says the Detailed Energy Use table is not how the bill is calculated, as of November 2026. The bill is the charge record. The file is the export.

What has to be in the file before a proposal?

Meter identity, step length, units, direction, quality flags, time basis, and a span covering the operations the project must serve. Leave estimated rows visible. Filling a gap and not saying so changes the peak.

Is hourly data useless on a 30-minute demand tariff?

It cannot reproduce that demand, though it can show shape and overlap with daylight. Ask for the tariff’s interval when the utility can provide it, and label which series supports each conclusion.

Bring the file, the tariff, and the operating limits

A storage conversation starts with the interval file, recent bills that name the schedule, and a plain account of which loads can move. Soleil Energy can look at that evidence with an owner in Maryland, Northern Virginia, or the District of Columbia through its battery storage practice, including sites that already have solar. The discussion does not size a system from a sample spreadsheet, and it does not treat a portal download as the bill. The useful result is a statement of which meter boundary, which tariff window, and which operating limits the next study would use.

Project requirements depend on the site, equipment and applicable rules. Confirm design and installation decisions with the appropriate qualified professional.

Start here

Apply this to your project

Discuss your solar or storage requirements with Soleil Energy.

Estimates are provided after a site review and are not binding until set out in a signed agreement.

Powering Smarter Infrastructure for a Sustainable Future.